Romarco was hired by a Ghent company to make the wall covering of the building completely asbestos free. It was important not to disturb the production in the building. The panels were detached from the structure for this purpose and removed between the building from a height of 36 metres with the aid of a tower crane. A not to be underestimated work, given the weight of 300 kg and the length of 5,5 metres of each of the panels.