The design, the detailed study and the implementation of a new 380 kV Scheldt Crossing, consisting of 2 very tall lattice masts that are connected to each other by means of a TACSR conductor, two wire sets. The two masts, each 192 m high, are located on the banks of the Scheldt, requiring very specific foundations and accesses.