About this project

Prepare the area for the construction of the Oosterweel Link. Wherever the Ring Road is to be deepened, obstacles must be removed from the substrate, which means, for example, that utility lines will be repositioned. Ground, sewage and road works + the linings (grout, sheet piles, sludge walls, etc.)

  • Project name

    Schijnpoort foundation work
  • Area of expertise

    Foundations
  • Location

    Antwerp
  • Developer

    BAM
  • Period

    2016-2018
  • Total value

    13 M€
  • Company

    Herbosch-Kiere